Previous Page
Next Page
Winding Index On-Line Catalog
VENSEL ENTERPRISES
1-800-662-6099
Catalog - Page 145

M155-0007
MANUAL STATOR WINDING FIXTURE

M155-0007  Base Only
M155-0007-T  Tooling Only per application

Operation of Base & Tooling combine:
1    Select proper tooling and mount in base
2    Pre-cuffed lamination stack is mounted on the tooling and positioned for proper slot alignment
3    The bobbin handle is raised to the up position
4    The bobbin is manually wound and lowered into the tooling using the insertion lever.  
       The wound coil is pushed off the bobbin into the lamination stack and pressed in place.
5    The lever is raised and the stator rotated to the next coil location.   The lever is lowered and the arm is raised and the procedure is repeated.

Production rate:  30 to 80 per day per machine
Tooling change time:  less than 5 minutes

Complete instructions and video included
Samples are required for tooling, M155-0007-T
 M155-0007 Tooling
M155-0007 Base
M155-9007-T
S-Wind Stator
M155-9007-S  Base Only
M155-9007-T  Tooling Only
Manual S-Wind Stator Winding Machine

Operation Simplified:  By using 3 handles and no repetitive round coil winding, you can produce a consistently balanced, 3 phase, S-Wound stator.  This will allow you the ease and flexibility to design output and cut in RPM conditions.  If you have one of our older manual stator winders, all you will need is additional tooling.

The Manual S-Wind Stator Winder allows you to wind the S-Wind stators with much less physical effort than the old style coil winder.  It will also allow duplication of OEM wire and S-wind power curve and the use of larger wire size.

Tooling Required Per S-Wind Stator Configuration:
M155-9007-S  Base Only
M155-9007-T  Tooling per Stator Configuration
Previous Page Next Page
Winding Index On-Line Catalog
VENSEL ENTERPRISES
1-800-662-6099
Catalog - Page 145